Cost information
In the construction industry the term ‘cost’ generally refers to the amount that has to (or will have to) be paid to receive goods or services. Different types of cost include capital costs, construction costs, operational costs, whole-life costs, environmental costs, social costs and so on.
Cost information is an important element across several activities that are involved in cost engineering (the practice of managing costs involved on a construction project), such as cost control, budgeting, forecasting, estimating, investment appraisal and risk analysis. It is also used to help measure profit margins, value assets and make decisions.
The type of cost information will depend on the particular type of costs that are being managed.
In relation to construction costs, cost information can be used to help set prices, which are typically the actual cost plus a percentage to allow for profit.
In the context of estimating construction or capital costs, cost information should be aligned with the project budget and can be set out in cost plans. These are generally prepared by cost consultants (often quantity surveyors) and evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers.
Types of cost plan include:
- Initial cost appraisal (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
For more information see: Cost plan.
Cost reporting is the process of providing a client (or other party) with information about the magnitude of a project’s predicted, or actual cost. This can be expressed either in absolute terms or as a variance compared to the project budget. Cost reports are typically prepared by a cost consultant (such as a quantity surveyor) and updated regularly (perhaps monthly), to keep the client informed and to help them and the project team control costs.
BCIS is the Building Cost Information Service of the Royal Institution of Chartered Surveyors (RICS). Cost and price information is collected by BCIS from across the UK construction industry, then collated, analysed, modelled, interpreted and made available to the industry to facilitate accurate cost planning.
For more information see: BCIS
NB The RIBA Plan of Work 2013 defines cost information as: 'All of the project costs, including the cost estimate and life cycle costs where required.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.